Solar Panel Installation at Sofina / Exceldor
Installation of a solar photovoltaic system at an Exceldor industrial facility, including the electrical integration of the system with the existing buildi
Beloeil, Québec

Challenge
The installation had to be completed in an active industrial environment while taking into account the building constraints, the characteristics of the existing electrical network, and the requirements associated with integrating on-site solar power generation. The work also had to be coordinated to minimize any impact on plant operations.
Result
The project enables Exceldor to generate a portion of its electricity directly on site using solar energy. The installation helps reduce the amount of electricity drawn from the utility grid and supports the facility’s broader energy efficiency initiatives.